Local Business Aerial pictures reveal progress made to repair crack in Forties pipeline By David McPhee December 20 2017, 8:39 am December 20 2017, 8:39 am Share Aerial pictures reveal progress made to repair crack in Forties pipeline Share via Facebook Twitter Whatsapp Messenger Linkedin Email Post link https://www.pressandjournal.co.uk/fp/business/local/1379156/aerial-pictures-reveal-progress-repair-crack-forties-pipeline/ Copy Link Picture credit: Cabro Aviation These pictures show the continued work underway to repair the crack in the Forties pipeline. The crack and subsequent leak has caused widespread disruption since its discovery two weeks ago. While there have been North Sea shutdowns in production, there is also the concern about shipments and stocks getting to where they need to be. Read the full story on our sister site, Energy Voice.