Local Business PICTURES: First turbine installed at Beatrice wind farm By Allister Thomas July 16 2018, 11:37 am July 16 2018, 11:37 am Share PICTURES: First turbine installed at Beatrice wind farm Share via Facebook Twitter Whatsapp Messenger Linkedin Email Post link https://www.pressandjournal.co.uk/fp/business/local/1521948/pictures-first-turbine-installed-at-beatrice-wind-farm/ Copy Link The first seven mega-watt (MW) turbine has been successfully installed at the Beatrice Offshore Wind Farm. Swire Blue Ocean’s Pacific Orca vessel installed the first of the 84 turbines at the site in the Moray Firth this weekend. To read more on Energy Voice, click here.