Calendar An icon of a desk calendar. Cancel An icon of a circle with a diagonal line across. Caret An icon of a block arrow pointing to the right. Email An icon of a paper envelope. Facebook An icon of the Facebook "f" mark. Google An icon of the Google "G" mark. Linked In An icon of the Linked In "in" mark. Logout An icon representing logout. Profile An icon that resembles human head and shoulders. Telephone An icon of a traditional telephone receiver. Tick An icon of a tick mark. Is Public An icon of a human eye and eyelashes. Is Not Public An icon of a human eye and eyelashes with a diagonal line through it. Pause Icon A two-lined pause icon for stopping interactions. Quote Mark A opening quote mark. Quote Mark A closing quote mark. Arrow An icon of an arrow. Folder An icon of a paper folder. Breaking An icon of an exclamation mark on a circular background. Camera An icon of a digital camera. Caret An icon of a caret arrow. Clock An icon of a clock face. Close An icon of the an X shape. Close Icon An icon used to represent where to interact to collapse or dismiss a component Comment An icon of a speech bubble. Comments An icon of a speech bubble, denoting user comments. Comments An icon of a speech bubble, denoting user comments. Ellipsis An icon of 3 horizontal dots. Envelope An icon of a paper envelope. Facebook An icon of a facebook f logo. Camera An icon of a digital camera. Home An icon of a house. Instagram An icon of the Instagram logo. LinkedIn An icon of the LinkedIn logo. Magnifying Glass An icon of a magnifying glass. Search Icon A magnifying glass icon that is used to represent the function of searching. Menu An icon of 3 horizontal lines. Hamburger Menu Icon An icon used to represent a collapsed menu. Next An icon of an arrow pointing to the right. Notice An explanation mark centred inside a circle. Previous An icon of an arrow pointing to the left. Rating An icon of a star. Tag An icon of a tag. Twitter An icon of the Twitter logo. Video Camera An icon of a video camera shape. Speech Bubble Icon A icon displaying a speech bubble WhatsApp An icon of the WhatsApp logo. Information An icon of an information logo. Plus A mathematical 'plus' symbol. Duration An icon indicating Time. Success Tick An icon of a green tick. Success Tick Timeout An icon of a greyed out success tick. Loading Spinner An icon of a loading spinner. Facebook Messenger An icon of the facebook messenger app logo. Facebook An icon of a facebook f logo. Facebook Messenger An icon of the Twitter app logo. LinkedIn An icon of the LinkedIn logo. WhatsApp Messenger An icon of the Whatsapp messenger app logo. Email An icon of an mail envelope. Copy link A decentered black square over a white square.

New images released of proposed £11.5million primary school in Elgin

Nearly 500 pupils will be able to attend Linkwood Primary School in the south of Elgin
Nearly 500 pupils will be able to attend Linkwood Primary School in the south of Elgin

A new £11.5million primary school in Moray’s biggest town has moved another step closer.

Linkwood Primary School will be built in the south of Elgin as part of a massive expansion that could eventually lead to 2,500 homes being built over the next 20 years.

Sites for two schools have already been confirmed, and Moray Council has now submitted final proposals for the first of them to be built.

About 460 pupils will be able to be accommodated in 16 classrooms, in addition to a nursery of 40 children.

Once they have gone through the reception area, visitors to the school will enter a large atrium that has been christened the “heart of the school”.

From there, pupils and staff will have direct access to the canteen, games hall, classroom areas and the playground.

The school will be situated next to the new Moray Sports Centre and a tree-lined avenue that will run from north to south through the new homes.

Documents prepared by designers JM Architects explain the metal and timber cladding on the outside of the building has been chosen to make it “stand proud” in its surroundings, so it can become a “focal point” of the community.

A report explained: “Our proposal is founded on the idea of simplicity and innovation.

“The proposed design puts the child and their learning opportunities at the centre of the school through the clear, efficient and flexible solution to the brief.

“Our design presents a simple and adaptable form, yet innovative approach to the school’s physical environment.”

Construction of the school, which will be next to the old railway line that leads to Rothes, is expected to begin in March next year.

Council staff expect that pupils will be able to move into the new buildings in 2019.

Students who will attend the school are currently being taught in temporary accommodation at East End Primary School.

New classrooms are needed in Elgin due to the existing schools being nearly full to capacity, while more than 3,000 homes are expected to be built in the town over the next two decades.

A replacement for Elgin High School remains on track to open to pupils next month.